/themes/plugins/font-awesome5/css/all.min.css?v=20261019
Excavator Mini excavator Backhoe loaders Loader Crawler excavator Bulldozer Crane Aerial platform Dumper Machinery equipment
Auctions Rental News Solutions & Partners GB Languages
Main menu
Main menu
Solutions & Partners
Buy
Sell
Useful links
About Via Mobilis
Hello, log in

June 4, 2025 – Press Review

By - 06/04/2025 03:16 pm
0 comments Reading 1 minute
    June 4, 2025 – Press Review

    Develon strengthens its European logistics in Belgium | Komatsu rolls out Smart Construction Remote across the board | Two Liebherr cranes achieve a feat in Sweden

    Develon strengthens its European logistics in Belgium

    (Source: Develon)

    Develon, formerly Doosan Construction Equipment, has opened a new spare parts distribution center in Boom, Belgium. This strategic site aligns with the brand’s European ambitions, as CEO Seung-Hyun Oh emphasized during the inauguration. To optimize the efficiency of this logistics platform, Develon has partnered with Fiege, a German company specializing in logistics. Leveraging its experience with Develon products, Fiege will contribute its expertise in implementing modern and effective logistics solutions.

    Komatsu rolls out Smart Construction Remote across the board

    (Source: Komatsu)

    Aiming to provide innovative tools for site management, Komatsu announces the standard integration of its Smart Construction Remote system into all its control and guidance equipment. Based on cloud technology, this solution enables remote and real-time machine operation. It is compatible with the iMC intelligent system, Smart Construction 3D guidance devices, and the PC220LCi-12 hydraulic excavator, ensuring broad interoperability.

    Two Liebherr cranes achieve a feat in Sweden

    (Source: Liebherr)

    In Karlskrona, Sweden, two Liebherr luffing jib cranes were deployed to erect the NKT Tower 3, a structure reaching 200 meters in height. Models 542 HC-L and 258 HC-L were chosen for their adaptability to the site's technical constraints, with the construction deadline set at just 90 days. The fast pace of the project required 24/7 operation, managed by a four-team rotation. As a precaution, key spare parts were delivered in advance to the site to minimize interruptions.

    image Marie

    Marie ANDRE

    Editorial Manager

    Responsible for content marketing and editorial manager of our news sections, Marie André joined the Via Mobilis group in 2017 after completing studies in linguistics and obtaining a professional license in SEO & web writing.

    logo linkedin LinkedIn

    Post a comment

    Your e-mail address will not appear on the website.

    Your personal data will not be given to third parties.

    Possible withdrawal of subscription via the link “Unsubscribe” in our newsletters or by sending an email to: info@via-mobilis.com

    This site is protected by reCAPTCHA. Google privacy policies and terms of service apply.

    Related news

    We are on social media!

    Twitter

    Top articles

    Please wait ...
    Top of the page