35 Liebherr tower cranes on the construction sites of the Olympic Village in Sochi!
The Liebherr tower cranes are working hard on the construction of a skating rink, a stadium, an ice hockey arena and many other sports facilities required for the 2014 Winter Olympics in Sochi. The Russians will also use this construction equipment to complete various infrastructure projects.
The Liebherr tower cranes are working hard on the construction of a skating rink, a stadium, an ice hockey arena and many other sports facilities required for the 2014 Winter Olympics in Sochi. The Russians will also use this construction equipment to complete various infrastructure projects.
Major construction projects for the 2014 Winter Olympics
In addition to the Olympic Village, the Liebherr tower cranes will also contribute to the construction of a railway bridge over the River Mzimta, a train station and a shopping mall. These infrastructures are expected to facilitate access to the venue location of the 2014 Winter Olympics in Sochi.
The cranes of the EC-H series: perfect for difficult construction sites
These Liebherr tower cranes are fast and easy to transport and to set up. At the simple push of a button, the Liebherr cranes of the EC-H Litronic series allow the load increase of up to 20%. The EC-H 40 FR.tronic, the crane model favoured by the Russians, has the maximum hook height of 79.7m. This Liebherr crane has the maximum load capacity of 40t. With the jib length of 80m, the EC-H 40 FR.tronic crane has the maximum jib-end load of 3.5t.
We are on social media!
Top articles
Post a comment